Ballot underway. See scope summary for details.
*NOTE: EP-23-O completed balloting and was approved on 12/13/13. However, J-STD-710 was developed and balloted under EP-23-N. Therefore, the voting process will complete in accordance with EP-23-N.
To create a set of unified blue-print icons which represent all facets of pre-wire and installation of electronic systems products and devices. This project does not cover anything outside of architectural blue-prints.
Designation of Proposed Standard:
J-STD-710
Title of Standard:
Audio, Video and Control Architectural Drawing Symbols Standard
Project Need:
Project is needed to create a standard for unified blueprint icons.
Project Intent:
Create new ANS
Includes text from ISO or IEC standard?:
No
Scope Summary:
To create a set of unified blue-print icons which represent all facets of pre-wire and installation of electronic systems products and devices. This project does not cover anything outside of architectural blue-prints.
PROGRESS:
04/22/2013: CPP issued.
09/08/2013: 14-day Draft issued.
10/27/2013: ANSI Public Review Ends.
12/2013: Resolved ANSI Public Review Comments.
06/23/2014: Completed editing the document per comments received.
07/2014: 2nd round of editing completed per additional feedback received from commenters of the ANSI Public Review.
09/11/2014: Recirculation ballot issued. Due to substantial number of edits made to the draft in order to resolve comments received during the ANSI Public Review, a recirculation ballot was required.
10/10/2014: Re-circulation Ballot Closed.
11/17/2014: ANSI Public Review Closed.
11/25/2014: BSR9 submitted.
ANSI approval received.